Progress

Amidst all the things that have not been going quite the way we'd like (T's car generating burning smells, kitchen faucet breaking and flooding the kitchen, AC not working on the one 90 degree day...) the flooring project is going swimmingly well! It looks like they may even be totally finished today! As promised, here are some photos of the progress:
A before picture of our living room. This isn't even a real before photo, because at this point we've already packed up the books from the shelves and sold the papsan chairs which were in the corners on either side of the window.
First, they ripped out all of the deadly carpet, what was left of the padding and pulled up all the carpet tacks.
Then, they had to level the floor. Apparently it is common for older buildings/homes to require this step. Our floors are concrete (fire and sound barrier) so the leveling was fairly easy. There turned out to be more spots to level than they originally anticipated, but that didn't bother them at all. The grey is the wet concrete.
Finally, they laid down an "underlayment" which is an optional layer of padding to give some cushion to the floor. It acts as another sound barrier and also keeps the floors from feeling as cold as if they were laid directly on the concrete. Once the underlayment is in place, they could go ahead and lay the wood. We chose eco-friendly engineered Brazilian cherry in cinnamon. Because it is engineered, they not only use the wood more efficiently to make the planks, but there is also no need for glues or adhesives. The planks are measured, cut and "click" into place which will also allow for more give.